The Waiting Game. Even though AYMO has his train together and air test completed, he still must sit and wait as MBTA 421 sneaks by on the other track. Inbound counterpart 422 will also ge... (more)
What better way to spend the last day of 2009 than photographing trains in the snow? MBCR 215 heads outbound through the signals and the snow at Milepost 7.
It's low tide along the Mystic River as Beverly bound train 67 crosses the new Draw 7 Bridge on a warm summer evening.